Scope of Construction and Exclusion
The following are construction and electric works that are not included in our installation projects.
Division | Description | Construction | Electricity |
---|---|---|---|
Hoist way | Poring of each floor entrance areas (entry, elevation button, location displayer, hall lantern, etc.) and finishing of walls after installation (filling with mortar) | ● | |
Fixing steel applied to the right and the left doors of the entry | ● | ||
Installation of ladders and electrical outlets for inspection of pit | ● | ● | |
Finishing construction after water-proof processing inside pit and mounting of a buffer | ● | ||
Supply and installation of hoist way barriers and intermediate materials (if necessary) | ● | ||
Removal of various pins and molds | ● | ||
Installation of safe banister on each floor entry to prevent falls | ● | ||
Wiring of electrical outlets | ● | ||
Piping and wiring of electric cords when installing CCTVs | ● | ||
Slope of hoist way shall be 0~30mm | ● | ||
Others (presented in a drawing) | ● | ● | |
Machine Room | Take-in way on the floor, poring, others in a drawing and finishing (cinder concrete) | ● | |
Installation of pulley beams and hooks on the ceiling | ● | ||
Installation of supplementary materials on the floor (if necessary) | ● | ||
Free supply of water for construction during installation | ● | ||
Free supply of a construction office and a place to store devices and materials | ● | ||
Installation of the entrance door before commencement of installation of elevators | ● | ||
Piping, wiring and finishing outside the hoist way when installing interphones in places other than machine rooms | ● | ||
Installation of lighting facilities and inspection light outlets | ● | ||
Power construction and free power supply for construction and test operation during installation | ● | ||
Wiring and piping for electricity for monitoring when applying monitoring boxes (monitoring box ~ hoist way) | ● | ||
Inlet and incoming panel construction up to each main incoming panel of emergency electricity as well as power and lighting inside a cage | ● | ||
Matters of Attention Related to Construction | The machine room entry is a fire door. It shall not be a passage to another place. | ● | |
Avoid exposed alignment of ducts, pipes, electricity, water, gas and fire hydrant for other purposes on the interior of the machine room and the hoist way and walls | ● | ||
The bottom of the pit cannot be used for housing, passaging and other purposes of humans | ● | ||
Power and voltage change ranges shall be -10%~+5%. | ● | ||
Install ventilation windows, ventilators and other air conditioners so that the machine room temperature and humidity do not exceed 40℃ and 90%, respectively. Also be careful not to cause noxious gases and dust. | ● |