{"id":1640,"date":"2021-06-07T13:54:07","date_gmt":"2021-06-07T04:54:07","guid":{"rendered":"http:\/\/bctr0020.blogcodi.gethompy.com\/en\/?page_id=1640"},"modified":"2021-10-14T12:37:14","modified_gmt":"2021-10-14T03:37:14","slug":"construction","status":"publish","type":"page","link":"http:\/\/hanjinele.com\/en\/construction\/","title":{"rendered":"Scope of Construction and Exclusion"},"content":{"rendered":"<div id=\"pl-1640\"  class=\"panel-layout\" ><div id=\"pg-1640-0\"  class=\"panel-grid panel-has-style\" ><div class=\"tacenter panel-row-style panel-row-style-for-1640-0\" id=\"stitle\" ><div id=\"pgc-1640-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-1640-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<p>BEYOND TECHNOLOGY \u00b7 <strong>HANJIN ELEVATOR<\/strong><\/p>\n<h2>PRODUCTS<\/h2>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><div id=\"pg-1640-1\"  class=\"panel-grid panel-has-style\" ><div id=\"bbox\" class=\"panel-row-style panel-row-style-for-1640-1\" ><div id=\"pgc-1640-1-0\"  class=\"panel-grid-cell\" ><\/div><div id=\"pgc-1640-1-1\"  class=\"panel-grid-cell\" ><div id=\"panel-1640-1-1-0\" class=\"so-panel widget widget_sow-editor panel-first-child\" data-index=\"2\" ><div id=\"sptitle\" class=\"panel-widget-style panel-widget-style-for-1640-1-1-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2>Scope of Construction and Exclusion<\/h2>\n<\/div>\n<\/div><\/div><\/div><div id=\"panel-1640-1-1-1\" class=\"so-panel widget widget_sow-editor panel-last-child\" data-index=\"3\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h5>The following are construction and electric works that are not included in our installation projects.<\/h5>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<th>Division<\/th>\n<th style=\"width: 70%;\">Description<\/th>\n<th>Construction<\/th>\n<th>Electricity<\/th>\n<\/tr>\n<tr>\n<td style=\"text-align: center; background-color: #f4f4f4;\" rowspan=\"11\"><strong>Hoist way<\/strong><\/td>\n<td>Poring of each floor entrance areas (entry, elevation button, location displayer, hall lantern, etc.) and finishing of walls after installation (filling with mortar)<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Fixing steel applied to the right and the left doors of the entry<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Installation of ladders and electrical outlets for inspection of pit<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Finishing construction after water-proof processing inside pit and mounting of a buffer<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Supply and installation of hoist way barriers and intermediate materials (if necessary)<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Removal of various pins and molds<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Installation of safe banister on each floor entry to prevent falls<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Wiring of electrical outlets<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Piping and wiring of electric cords when installing CCTVs<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Slope of hoist way shall be 0~30mm<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Others (presented in a drawing)<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; background-color: #f4f4f4;\" rowspan=\"11\"><strong>Machine Room<\/strong><\/td>\n<td>Take-in way on the floor, poring, others in a drawing and finishing (cinder concrete)<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Installation of pulley beams and hooks on the ceiling<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Installation of supplementary materials on the floor (if necessary)<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Free supply of water for construction during installation<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Free supply of a construction office and a place to store devices and materials<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Installation of the entrance door before commencement of installation of elevators<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Piping, wiring and finishing outside the hoist way when installing interphones in places other than machine rooms<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Installation of lighting facilities and inspection light outlets<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Power construction and free power supply for construction and test operation during installation<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Wiring and piping for electricity for monitoring when applying monitoring boxes (monitoring box ~ hoist way)<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td>Inlet and incoming panel construction up to each main incoming panel of emergency electricity as well as power and lighting inside a cage<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; background-color: #f4f4f4;\" rowspan=\"5\"><strong>Matters of Attention Related to Construction<\/strong><\/td>\n<td>The machine room entry is a fire door. It shall not be a passage to another place.<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Avoid exposed alignment of ducts, pipes, electricity, water, gas and fire hydrant for other purposes on the interior of the machine room and the hoist way and walls<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>The bottom of the pit cannot be used for housing, passaging and other purposes of humans<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Power and voltage change ranges shall be -10%~+5%.<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<tr>\n<td>Install ventilation windows, ventilators and other air conditioners so that the machine room temperature and humidity do not exceed 40\u2103 and 90%, respectively. Also be careful not to cause noxious gases and dust.<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\">\u25cf<\/td>\n<td style=\"text-align: center; background-color: #f4f4f4;\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>BEYOND TECHNOLOGY \u00b7 HANJIN ELEVATOR PRODUCTS Scope of Construction and Exclusion The following are construction and electric works that are not included in our installation projects. Division Description Construction Electricity Hoist way Poring of each floor entrance areas (entry, elevation button, location displayer, hall lantern, etc.) and finishing of walls after installation (filling with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"pagetemplate-fullwidth.php","meta":[],"_links":{"self":[{"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/pages\/1640"}],"collection":[{"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/comments?post=1640"}],"version-history":[{"count":0,"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/pages\/1640\/revisions"}],"wp:attachment":[{"href":"http:\/\/hanjinele.com\/en\/wp-json\/wp\/v2\/media?parent=1640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}